
Refilling of Ivanhoe started in November 2024. The flow is being pumped slowly to
adhere to regulations from the Division of Safety of Dams, a process that will take
about 4-5 months. The water refilling in Ivanhoe will go through the spillway to fill
Silver Lake.
Comments